Michal Plaček, Martin Schmidt, František Ochrana, Milan Půček

The article deals with the issue of the length of procedure in public procurement. Our analysis focuses on construction contracts in 2010–2015. We apply hierarchical linear regressions to these data to identify factors that affect the length of procedure. According to our results, the duration of a public contract does not affect the standard contract price. The nature of the contracting authority, the expected value, the openness of the procurement procedure, and the method of evaluation have a statistically significant impact on the length of the contract. As for other factors regarding the length of awarding time, the use of the subcontractor, the division of a contract into parts, and a review by the Office for the Protection of Competition due extend the time required. By contrast, contracting time can be reduced by the use of outsourcing. In the end of the article, we have put forward recommendations for economic policy and further research.

Keywords: accountability, decentralization, delays, public procurement

JEL Classification: H57, H72, H77

References:

Ahsan, K., Rahman, S. (2017). Green Public Procurement Implementation Challenges

in Australian Public Healthcare Sector. Journal of Cleaner Production, 152, 181–197,

https://doi.org/10.1016/j.jclepro.2017.03.055

Baldi, S., Bottasso, A., Conti, M., Piccardo, Ch. (2016). To Bid or Not to Bid: That Is the Question:

Public Procurement, Project Complexity and Corruption. European Journal of Political

Economy, 43, 89–106, https://doi.org/10.1016/j.ejpoleco.2016.04.002

Borowiec, A. (2017). The Impact of Public Procurement System on the Development

of Competition in the Economy in the Light of Empirical Research. Oeconomia

Copernicana, 8(1), 37–50, https://doi.org/10.24136/oc.v8i1.3

Brezovnik, B., Oplotnik, Ž. J., Vojinovič, B. (2015). (De)centralization of Public Procurement

at the Local Level in the EU. Transylvanian Review of Administrative Sciences, 2015(46E),

37–52, https://doi.org/10.1111/j.1468-0297.2006.01049.x

Carson, S. J., Madhok, A., Wu, T. (2006). Uncertainty, Opportunism, and Governance: the Effects

of Volatility and Ambiguity on Formal and Relational Contracting. The Academy

Management Journal, 49(5), 1058–1077, https://doi.org/10.5465/AMJ.2006.22798187

Coviello, D., Mariniello, M. (2014). Publicity Requirements in Public Procurement: Evidence from

a Regression Discontinuity Design. Journal of Public Economics, 109, 76–100, https://doi.org/10.1016/j.jpubeco.2013.10.008

Dametri, R. P. (2012). Centralization vs Decentralization of Purchasing in the Public Sector:

The Role of e- Procurement in the Italian Case. In Khachidze, V. (ed.) iCETS 2012: 457–470

De Schepper, S., Haezendonck, E., Dooms, M. (2015). Understanding Pre-Contractual

Transaction Costs for Public–Private Partnership Infrastructure Projects. International

Journal of Project Management, 33(4), 932–946, http://doi.org/10.1016/j.ijproman.2014.10.015

Decarolis, F., Palumbo, G. (2015). Renegotiation of Public Contracts: An Empirical Analysis.

Economics Letters, 132, 77–81, https://doi.org/10.1016/j.econlet.2015.04.025

Dosi, C., Moretto, M. (2015). Procurement with Unenforceable Contract Time and the Law

of Liquidated Damages. Journal of Law Economics & Organization, 31(1), 160–186,

https://doi.org/10.1093/jleo/ewt020

Erdis, E. (2013). The Effect of Current Public Procurement Law on Duration and Cost

of Construction Projects in Turkey. Journal of Civil Engineering and Management, 19(1),

121–135, https://doi.org/10.3846/13923730.2012.746238

Fazekas, M., Toth, I. J., King, P. L. (2016). An Objective Corruption Risk Index Using Public

Procurement Data. European Journal on Criminal Policy and Research, 22(3), 369–397,

http://doi.org/10.1007/s10610-016-9308-z

Guccio, C., Pignataro, G., Rizzo, I., (2014). Do Local Governments Do It Better? Analysis of Time

Performance in the Execution of Public Works. European Journal of Political Economy, 34,

237–252, https://doi.org/10.1016/j.ejpoleco.2014.01.010

Lennerfors, T. T. (2007). The Transformation of Transparency - on the Act on Public Procurement

and the Right to Appeal in the Context of the War on Corruption. Journal of Business

Ethics, 73(4), 381–390, https://doi.org/10.1007/s10551-006-9213-3

Loader, K. (2010). Is Local Authority Procurement ‘Lean’? An Exploration to Determine

if ‘Lean’ Can Provide a Useful Explanation of Practice. Journal of Purchasing and Supply

Management, 16(1), 41–50, https://doi.org/10.1016/j.pursup.2009.10.001

Loader, K. (2016). Is Local Authority Procurement Supporting SMEs? An Analysis of Practice

in English Local Authorities. Local Government Studies, 42(3), 464–484, http://doi.org/10.1080/03003930.2016.1157068

Lundberg, S., Bergman, M. (2017). Tendering Design when Price and Quality Is Uncertain.

International Journal of Public Sector Management, 30(4), 310–327, http://doi.org/10.1108/IJPSM-04-2016-0063

Moe, C. R., Newman, M., Sein, K. M. (2017). The Public Procurement of Information Systems:

Dialectics in Requirements Specification. European Journal of Information Systems, 26(2),

143–163, http://doi.org/10.1057/s41303-017-0035-4

Murray, G. (2007). Strategic Procurement in UK Local Government: The Role of Elected

Members. Journal of Public Procurement, 7(2), 194–212.

Nikou, Ch., Moschuris, S., Filiopoulos, I. (2017). An Integrated Model for Supplier

Selection in the Public Procurement Sector of Defence. International Review

of Administrative Sciences, 83(1), 78–98, http://doi.org/10.1177/0020852316634446

Ochrana, F., Pavel, J. (2013). Analysis of the Impact of Transparency, Corruption, Openness

in Competition and Tender Procedures on Public Procurement in the Czech Republic.

Central European Journal of Public Policy, 7(2), 114–135.

OECD (2000). Centralised and Decentralised Public Procurement. Sigma Papers, 2000, No. 29,

Paris: OECD Publishing, https://doi.org/10.1787/5kml60w5dxr1-en

OECD (2007). Central Public Procurement Structures and Capacity in Member States

of the European Union. Sigma Paper, No. 40, Paris: OECD Publishing, https://doi.org/10.1787/5kml60qdqq0n-en

OECD (2011). Centralized Purchasing Systems in the European Union. Sigma Papers, 2011, no. 47,

Paris, OECD Publishing, https://doi.org/10.1787/5kgkgqv703xw-en

OTIDEA (2016). Public Procurement 2010-2015: Expert Report Mapping the Area of Public

Procurement in the Czech Republic. Prague. Czech Republic.

Plaček, M., Schmidt, M., Ochrana, F., Půček, M. (2017). Do the Selected Characteristics of Public

Tenders Affect the Likehood of Filling Petition with Regulators of Public Tenders? Prague

Economics Papers, 26(3), 317–329, https://doi.org/10.18267/j.pep.616

Plaček, M., Ochrana, F., Schmidt, M., Půček, M. (2016). The Evaluation of Role of the Office for

Protection and Competition of the Czech Republic in Regulating Public Procurement.

NISPAcee Journal of Public Administration and Policy, 9(1), 97–117, http://doi.org/10.1515/nispa-2016-0005

Rose-Ackerman, S. (1999). Corruption and Government: Causes, Consequences, and Reform. New

York, NY: Cambridge University Press. ISBN 9781107441095.

Sanchez Solino, A., Gago de Santos, P. (2016). Influence of the Tendering Mechanism

in the Performance of Public-Private Partnerships: A Transaction Cost Approach. Public

Performance & Management Review, 40(1), 97–118, http://doi.org/10.1080/15309576.2016.1177558

Schmidt, M., Plaček, M., Ochrana, M., Půček, M. (2016). An Empirical Analysis of Post-

Contractual Behavior in Public Works Contracts: The Czech Case as a Secondary

Comparison with the Slovak Republic. Ekonomický časopis, 64(6), 501–518, http://doi.org/10.15240/tul/001/2016-4-007

Soliño, A. S., Gago de Santos, P. (2010). Transaction Costs in Transport Public–Private

Partnerships: Comparing Procurement Procedures. Transport Reviews, 30(2010), 389–406,

http://doi.org/10.1080/01441640903037941

Stloukalová, T., Jurčík, R. (2015). Relationship between Estimated Value of Public Contract and

its Price. Proceedings of the 12th International Scientific Conference European Financial

Systems, Brno, Czech Republic: 544–551.

Tkachenko, A., Yakovlev, A., Kuznetsova, A. (2017). Sweet Deal´s: State-Owned Enterprises,

Corruption and Repeated Contracts in Public Procurement. Economic Systems, 41(1),

52–67, http://doi.org/10.1016/j.ecosys.2016.12.002

Williamson, O. E. (1985). The Economic Institutions of Capitalism: Firms, Markets, Relational

Contracting. New York, NY: Free Press.

Wooldridge, J. (1999). Econometric Analysis of Cross Section and Panel Data. MIT Press.